Paulsen Road Township Bridge
Project Description
Project Location Map
The replacement of a Township bridge over the North Branch Kishwaukee River in Hartland Township.Click here for Transportation Programs
Project Status
Phase I preliminary engineering is underway
Phase II design engineering is anticipated to start in 2024
Phase III construction is anticipated to start in 2026
Public Notice
Section 4(f) de minimis Impacts – Brookdale Conservation Area
The McHenry County Division of Transportation (MCDOT) is seeking public comments on the effects that proposed replacement of the Paulsen Road bridge over the North Branch Kishwaukee River will have on the Brookdale Conservation Area. The Brookdale Conservation Area, which is under the jurisdiction of the McHenry County Conservation District, is a significant, publicly owned recreational area. As such, it is subject to protection under Section 4(f) of the U.S. Department of Transportation Act of 1966. For the Paulsen Road project, MCDOT intends to seek a Section 4(f) “de minimis” impact finding from the Federal Highway Administration based on a determination that the project will not adversely affect the features, attributes, or activities that qualify the Brookdale Conservation Area for protection under Section 4(f).
Effects of the Paulsen Road bridge replacement project on the Brookdale Conservation Area will include permanent right-of-way acquisition along the west side and east side of Paulsen Road to re-establish roadway ditch grading. Mitigation will include restoring the land with vegetation. Detailed documentation describing the impacts and mitigation associated with the effects of the Paulsen Road bridge replacement project on the Brookdale Conservation Area is available for review in the Draft Section 4(f) Document (see link below).
Comments regarding this project can be submitted in person at the MCDOT office, submitted online below, or mailed to the MCDOT office (Attn: Samantha Dittrich). Comments must be received by September 11, 2023 to be considered as a part of the public record.
Draft Section 4(f) Document–Brookdale Conservation Area
Advertisement for Public Review of the Section 4(f) Document
Public Involvement Opportunities
Click here to leave feedback on this project
Available Documents
Existing Bridge Plans
Bridge Inspection Report_2020
Bridge Inspection Report_2022
Contact Information:
Scott Czaplicki, P.E.
MCDOT Project Manager
sdczaplicki@transystems.com
Scope of Work | Municipality | County Board District | ||
Bridge Replacement |
Unincorporated Hartland Township | District 8 | ||
Category | Lead Agency | Total Cost | ||
Preservation | McHenry County DOT | $2,500,000 |